Day 11 – Had to go to the office

Weight = 107.2 Kgs

Steps Completed =15011

So this morning I had to go into the office and fix a server even though I was on holiday so I got up at normal time as I had slept at home last night as it was snowing pretty hard at my parents house last night.

When I got up I did my weigh-in and I was down to 107.2 kgs which is amazing! I then got showered and walked into the office and moved the server with issues and then set up my new monitors on my desk.

I then walked home and waited for a call from the lorry with the type 1 for the track maintainance. I got the call at 10 ish so I headed to the track and sorted that out and then headed home. By the time I got home I was on over 12000 steps already.

When I got home I was hungry so i ordered takeout for beakfast which arrived about 11:30 so I ate that and then chilled while I then waited for my desk legs to be delivered and they arrived at about 13:30. While I was waiting for the desk legs to arrive I was watching TV which I did all afternoon until about 8pm when I loaded the desk legs into the car and tried to take them to the office but one of my neighbours had parked their car in such a way that they had blocked off the road and left it like that! So I reversed back to my driveway and gave up for the day!

Today was a bit of a waste of a day in terms of working on the house as all I got done today was getting rid of the carpet strips and got rid of some of the sticky pad residue on the wall and that was about it but I did get some well earned rest and also got my monitors set up to hit the ground running next week and also got in 15011 steps for the day in so a really good day walking wise.

I unfortunately did not get a ruck in or do my Lüften but other than that it was a good day and I am feeling a lot better for taking it a bit easy.

I spent most of the evening researching self levelling flooring as I am going to have to do this in my bedroom now as all the tiles around the edge of the room are smashed to pieces from the carpet strips being installed so I will need to self level before I can fit the flooring.

I have decided that I will paint this week and then put the room back how its going to be without the floor and live with the tiles for a bit and then the last weekend in January I will self level the floor and then put the lino down and put the skirting boards back on again.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *